The Diary Game||Date:13-11-2024||Mitsubishi ME96SS model electrical energy meter setup.

mahadisalim -

Steemian Friends,
Today, I will write about my diary game, dated 13-11-2024. I will share the parts of my daily work with you by writing a diary. I hope everyone will like my diary writing.


Thumbnail Photo(When setting up the Mitsubishi ME96SS model energy meter)

Today, I wake up at 7.00 am and read an updated newspaper on my mobile. Then I brush my teeth. Take a shower and prepare to go to the office. I left home for the office at 9.00 am. After reaching the office, I have breakfast. Then I go to the salon to get my hair cut short. My hair has grown. After about two hours, I cut my hair and returned to the office from the salon. Head cold after cutting hair.


At the salon for a hair cut

I came to the office and went to the substation room because, after the electrical maintenance work yesterday, I checked the functionality of the electrical devices. A new energy meter is having meter reading problems. So, I reset the cable controlling the energy meter. My electrical team works with me. I first draw the connection diagram of the energy meter. Then, I explain the diagram to the electricians.


While setting up the energy meter by looking at the electrical drawing

After connecting the energy meter according to the diagram, turn on the energy meter with the power supply. After the energy meter is on, I calculate the electrical current and give the CT ratio. Find the settings from YouTube using the model number of the energy meter. After about an hour, the installation of the energy meter is complete. From now on I can generate electricity bills through this meter.


During software setup with power supply to energy meter

Then I leave the office to have lunch. I came back to the office after an hour after lunch. Come to the office and rest for some time. Then, I started writing my first blog of the day on the Steemit platform. Take about an hour to write a blog and focus on office work. Then I went to the electrical substation and did my office work. Rods are produced in our factory. A very high voltage is required to melt iron. Billets are produced by melting iron. Manufactured billet reheating furnaces are used to manufacture rods in various processes.


Production Unit

In the afternoon, I left the office and went home. Go home and rest for some time. Then, review two homework assignments for Steemit Learning Challenges. Then at 10.00 pm eat and sleep.